The ceramic tile in the Mudroom, 1/2 Bath, Laundry area showing the transition tiles in one of the doorways. The tile is still hazy and hasn't been cleaned with vinegar after grouting.
The electric floor heating cables in the Master Bath. The heating cable is kept away from the toilet a repectable distance (otherwise the wax seal melts!) and the cable is not under the vanities.
Spreading thinset for the tile backerboard, a concrete board product. I cut and installed 40+ sheets (3' x 5' and 4' x 4') as underlayment for the ceramic floor tile in four areas of the house.
One of the 2 Great Room built-in cabinets. This cabinet is made for a TV to be placed on top of the base. There will be crown molding across the top of the bookcase.
Jeff Spivey of Precision Woodworking finishing the trim on the den built-in cabinet. The trim piece that he's putting on has already been stained and finished because, basically, the painters got carried away pre-finishing the trim material.
Starting up the geothermal heating system. They had to wire in the loop circulating pump (middle picture) and put on a temporary thermostat to get heat in the house for the trim carpenters and painters.