Deck construction, one week later than pics below. Front support beam is partially complete; among other things, two layers of 2x material are still needed on the 2 right-side spans. Post/beam connections that won't get bolted (like the post pocketed to accept 2x12 and 2x10 sections) will get Simpson Strong-Tie hardware added. Four posts that outline a square area (to the right of the garage door) will be a storage shed under the deck. Part of the future construction will be putting in a deck floor/room ceiling that drains water to keep the shed dry. Eventually will dig the dirt out in the shed and pour a concrete floor, and a concrete patio between the shed and basement door.