Tuesday, May 09, 2006



Chad at the controls of the drilling rig. Boring our geothermal loop was supposed to have taken place many weeks ago, but the bad storm that came through gave Chad a boatload of utility work that took priority over us. The delay wasn't a problem for us, though, as we're still doing mechanical rough-ins. (Actually, today Chad pulled off our job because a shopping mall lost power and he was called in to do some emergency utility boring.)

0 Comments:

Post a Comment

<< Home