
Chad at the controls of the drilling rig. Boring our geothermal loop was supposed to have taken place many weeks ago, but the bad storm that came through gave Chad a boatload of utility work that took priority over us. The delay wasn't a problem for us, though, as we're still doing mechanical rough-ins. (Actually, today Chad pulled off our job because a shopping mall lost power and he was called in to do some emergency utility boring.)
0 Comments:
Post a Comment
<< Home