Friday, January 20, 2006
Previous Posts
- One inch blue styrofoam sandwiched between the I-j...
- All the I-joists were set today. They real...
- The view from the street below showing the backsid...
- The engineered lumber arrived, consisting of I-joi...
- Framing the basement. Along the back wall overlook...
- The foundation is in, the basement walls are done,...
- Dec. 28, Plumbing rough-in. We've got over 1/2 of ...
- Finally it was warm enough to pour the basement wa...
- The next couple weeks have been slow going, it's ...
- Saturday, Dec. 3rd. The concrete set up over night...