Wednesday, November 30, 2005



Smooth basement floor.















Clearing a path for the driveway aggregate.


The first scoops.

At last, the foundation digging was ready to begin. It took a couple days to dig the foundation/basement and a lot of good soil was hauled away. It was very cool to watch the CAT excavator dig a hole that soon transitioned into a smooth dirt floor that literally looked like a lifesize version of our house drawings.

0 Comments:

Post a Comment

<< Home