Smooth basement floor.
Clearing a path for the driveway aggregate.
The first scoops.
At last, the foundation digging was ready to begin. It took a couple days to dig the foundation/basement and a lot of good soil was hauled away. It was very cool to watch the CAT excavator dig a hole that soon transitioned into a smooth dirt floor that literally looked like a lifesize version of our house drawings.
0 Comments:
Post a Comment
<< Home